In 2024 Houchens Industries contracted with Energy Efficient Technologies to validate the savings and carbon footprint reductions for their 400 grocery store chain.

Below are the results of efficiency improvements by age of equipment based on ASHRAE and the Department of Energy recommended testing method to compare equipment before and after an energy conservation measure is deployed. This is the International performance measurement and verification Protocol (IPMVP, Option B) on 2 rooftop DX machines. These are savings produced every time the unit runs, every year, for the life of the machines:





EET performed numerous energy audits for building for the City of Greenbelt. Upgrade All LED lighting at the Greenbelt Police Station, 376 fixtures, several thousand LED's
CryoGenX4 Validation Pilot Project Overview March-May 2021 Energy Efficient Technologies (EET) and a major national brewer (MNB) began jointly conducting a performance pilot on the chiller cooling...
EET installed investment grade meter at TELX Atlanta to validate the savings associated with restoring lost efficiency caused by oil fouling. The technology is now in it's 4th patented generation and...
Energy Efficient Technologies
400 East Pratt Street, Suite 800
Baltimore, MD 21202
800-344-8132 (Office)