Avalon Bay was looking to replace older lighting and reduce carbon footprint and energy usage in their 4 buildings in Virginia. Energy Efficient Technologies won the contract beating their two national contractors that had been working for them for ten years.
Energy Efficient Technologies replaced about 3000 lights with LED across the four facilities.
Keeping it Cold Premier Distribution Company (PDC) and Anheuser-Busch need to keep their product cold, and stored at a consistent level. The surrounding desert atmosphere was another factor that...
EET installed investment grade meter at TELX Atlanta to validate the savings associated with restoring lost efficiency caused by oil fouling. The technology is now in it's 4th patented generation and...
Energy Efficient Technologies(EET) installed approximately 95 sensors as part of an ASHRAE Level III audit to identify how to save energy and reduce costs in Dollar Bank data center while improving...
Energy Efficient Technologies
400 East Pratt Street, Suite 800
Baltimore, MD 21202
800-344-8132 (Office)