Avalon Bay Multi-Family- Virginia

Lighting Sustainability

Avalon Bay

Avalon Bay was looking to replace older lighting and reduce carbon footprint and energy usage in their 4 buildings in Virginia.  Energy Efficient Technologies won the contract beating their two national contractors that had been working for them for ten years.

The Results – Efficiency

Energy Efficient Technologies replaced about 3000 lights with LED across the four facilities.

  • Payback in 1.76 Years
  • Lifetime ROI 525%

Related Case Studies

Courtyard by Marriott

Courtyard by Marriott: EET Deployed and validated savings on all equipment at this Crystal City VA location. Performance Results from the Demo The average key performance indicators (KPI’s) measured...

Major National Brewery

CryoGenX4 Validation Pilot Project Overview March-May 2021 Energy Efficient Technologies (EET) and a major national brewer (MNB) began jointly conducting a performance pilot on the chiller cooling...

Maxim Healthcare Columbia, MD

Maxim Healthcare energy efficiency projects save $1.4 Million in Savings Energy Efficient Technologies has been working with Maxim Healthcare, a skilled nursing company, to reduce carbon footprint...

EET Logo

Energy Efficient Technologies
400 East Pratt Street, Suite 800
Baltimore, MD 21202

800-344-8132 (Office)

Connect On Social