Vodacom Cell Towers

2019-2020  The manufacturer of CryoGenX4 validated in Cell Phone tower HVAC systems in South Africa.

22.7% improvement in the Delta-T 

9.9% reduction in kWh’s consumed during this demonstration,

Vodacom will be able to reduce the AC load in their ~12,500 cell tower huts across the country by 10%.

Related Case Studies

Tojo Mushroom

Tojo Mushroom-Food Manufacturer Pennsylvania Tojo Mushroom was looking to save costs and reduce their carbon footprint. Energy Efficient Technologies performed a detailed energy audit, made numerous...

Reefers

The Manufacturer of CryoGenX4 oversaw validations for Reefers in South Africa. A single reefer trailer was tested sucessfully with 42% improvement in pull down times due to CryoGenX4 making it colder...

Digital Realty Trust TELX Data Centers

EET installed investment grade meter at TELX Atlanta to validate the savings associated with restoring lost efficiency caused by oil fouling. The technology is now in it's 4th patented generation and...

EET Logo

Energy Efficient Technologies
400 East Pratt Street, Suite 800
Baltimore, MD 21202

800-344-8132 (Office)

Connect On Social