Tojo Mushroom was looking to save costs and reduce their carbon footprint.
Energy Efficient Technologies performed a detailed energy audit, made numerous recommendations for improvements.
The purpose of this case study is to provide the results of the savings validation pilot of an HVAC and refrigeration ECM now known as CryoGenX4 at the largest mushroom growing facility in the US
Operation of the Mushroom House
Each HVAC unit used for conditioning the mushroom house operates on a unique schedule of set points, percentage of outside air, backup A/C, and heat at 100% while A/C is on. This schedule is important as the operation of the equipment affect the results of the test.
Data Analysis
The data was analyzed by gathering the operation schedule of each unit and categorizing similar settings of set point, outside air percentage, and outside temperature. Using multiple similar days the percentage of savings before and after were created and averaged to present a final value.
Other Food Manufacturing Case Studies:
Energy Efficient Technologies performed energy audits, LED lighting upgrades, HVAC optimization and tune up programs and deployed the family of CryoGenX4 products in all branches throughout Baltimore...
Mitchell Distributing, Gulfport, MS Location Staying Cool, and Profitable with an 842% ROI When it comes to keeping products cool and protected, Mitchell Distributing’s HVAC and refrigeration systems...
Saving in Manufacturing This facility is one of the largest HVAC equipment manufacturers in the world. This location in Baltimore was looking to reduce cost and get better, safer lighting in 2016....
Energy Efficient Technologies
400 East Pratt Street, Suite 800
Baltimore, MD 21202
800-344-8132 (Office)