Tojo Mushroom was looking to save costs and reduce their carbon footprint.
Energy Efficient Technologies performed a detailed energy audit, made numerous recommendations for improvements.
The purpose of this case study is to provide the results of the savings validation pilot of an HVAC and refrigeration ECM now known as CryoGenX4 at the largest mushroom growing facility in the US
Operation of the Mushroom House
Each HVAC unit used for conditioning the mushroom house operates on a unique schedule of set points, percentage of outside air, backup A/C, and heat at 100% while A/C is on. This schedule is important as the operation of the equipment affect the results of the test.
Data Analysis
The data was analyzed by gathering the operation schedule of each unit and categorizing similar settings of set point, outside air percentage, and outside temperature. Using multiple similar days the percentage of savings before and after were created and averaged to present a final value.
Other Food Manufacturing Case Studies:
CryoGenX4 Validation Pilot Project Overview March-May 2021 Energy Efficient Technologies (EET) and a major national brewer (MNB) began jointly conducting a performance pilot on the chiller cooling...
Our client, Pizza Hut of MD, operates 48 locations. Energy Efficient Technologies began working with a Baltimore Pizza Hut in 2008, installing 175 sensors to capture all operational and energy data...
Helping Hub Centers A major food distributor in the McDonald’s system owns three main hub centers across the country, each of which was included in a three year-long study of CryoGenX4. The goal of...